BRAM-COR integrates its PW-WFI-PS Generation equipment with state-of-the-art distribution loops. Our Loop design is the result of a careful evaluation of Points of Use delivery criteria such as:
The loop construction and installation is carried out by qualified welders following BRAM-COR sanitary piping procedures, according to ASME BPE standards. All pipelines are passivated and inspected, according to ASME acceptance criteria, to check
A thoroughful loop documentation, including isometric drawings, welding reports, boroscopy records, passivation certificate and test reports is provided to complete the supply.